Technical approval of the work done
1) Main highway Risan – Žabljak, section Dragalj Polje – Grahovo, l=7km |
Besides this, the representatives of SIMM Engineering, participated as members of the committee, for traffic phase, for technical receipt of works of the following:
2) Reconstruction of the main highway M2, section Podgorica-Kolašin, sites: |
- Mioska, l=0.70km
- Dubravice, l=1.03km
- Dubravice-Seoca 1, l=1.03km
- Seoca 1 – Seoca 2, l=1.10km
- Seoca 2 - Dolovi, l=0.88km
- Dolovi-Crkvine, l=1.25km
- Bablja greda, l=0.54km
3) Residential building on Urban Plot 12, in urban block 3, in the area of Detailed Urban Plan „Blok 6, Kruševac“ – amendments in Podgorici |